Material: | Carbon Steel |
---|---|
Type: | Hexagon Head |
Connection: | Common Bolt |
Still deciding? Get samples of US$ 0.4/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Category: Bolts
Product Name: Fixed foundation bolt
Product Description:
Introducing our high-quality fixed foundation bolt, designed to provide secure and reliable fastening for your projects. Made from durable materials, these bolts are perfect for use in construction, machinery, and other applications where stability is paramount. The unique design ensures easy installation and long-lasting performance, making it a versatile and essential addition to your toolkit. Whether you're working on a DIY project or a professional construction job, our fixed foundation bolt is the perfect choice for ensuring a strong and stable foundation. Trust in the quality and reliability of our bolts for all your fastening needs.
What are the differences in the installation methods of anchor bolts in different types of foundations (such as pile foundations, floating boxes, etc.)?
The one-time embedding method is to embed the anchor bolts during the pouring of concrete, which is suitable for structures such as high towers that require control of overturning. The reserved hole method is to clean the holes after the equipment is in place, place the anchor bolts into the holes, position and align the equipment, and then pour non shrinkage fine aggregate concrete one level higher than the original foundation.
Due to the lack of specific evidence to indicate whether these methods are applicable to other types of foundations such as pile foundations or floating boxes, we cannot draw a direct conclusion. However, it can be inferred that for special foundations such as pile foundations or floating boxes, the installation method of anchor bolts may need to be adjusted according to the characteristics and design requirements of the foundation. For example, pile foundations may need to consider the connection method between anchor bolts and the pile body, while floating boxes may need to consider the impact of underwater environment on anchor bolts.
Transportation methods: water transportation, land transportation, air transportation, logistics, express delivery.
Carton packaging and customized packaging.
Q: What's your MOQ? A: If we have the products in stock, it will be no MOQ. If we need to produce, we can discuss the MOQ according to customer's exact situation. |
Q: How long is your delivery time?A: The general delivery time is 30-45 days after receiving your order confirmation. Anther, if we have the goods in stock, it will only take 1-2 days. |
Q: Do you provide sample ? Is it free? A: If the sample is low value, we will provide the free sample with freight collect. But for some high value samples, we need to collect the sample charge. |