Certification: | CE, RoHS, GS, ISO9001 |
---|---|
Standard: | DIN, ASTM, GOST, GB, JIS, ANSI, BS |
Customized: | Customized |
Still deciding? Get samples of US$ 0.2/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Metal Processing Machinery Parts: Casing Threaded Joint
Our Casing Threaded Joint is a high-quality component designed for metal processing machinery. This threaded joint is precision-engineered to provide a secure and reliable connection between casing components, ensuring efficient operation and minimal downtime.
Manufactured using top-grade materials, our Casing Threaded Joint offers excellent durability and resistance to wear, making it ideal for heavy-duty industrial applications. The threaded design allows for easy installation and maintenance, saving valuable time and resources for your business.
Trust in our Casing Threaded Joint to enhance the performance and longevity of your metal processing machinery. Contact us today to learn more about this essential part and how it can benefit your operations.
These stainless steel accessories play an important role in different application scenarios, such as construction, furniture, industrial equipment, etc. Each accessory has its specific purpose and installation method, ensuring its reliability and durability in practical applications.
Mode of transportation: water transport, land transport, air transport, express delivery, logistics.
Carton packaging and customized packaging.
Q: What's your MOQ? A: If we have the products in stock, it will be no MOQ. If we need to produce, we can discuss the MOQ according to customer's exact situation. |
Q: How long is your delivery time?A: The general delivery time is 30-45 days after receiving your order confirmation. Anther, if we have the goods in stock, it will only take 1-2 days. |
Q: What is your term of payment? A: 30% down payment before producing and 70% balance payment before shipping. |